EVAutoBlog.com
  • Home
  • General News
  • Auto News
  • Vehicle Insurance
  • Video
  • Guide
No Result
View All Result
  • Home
  • General News
  • Auto News
  • Vehicle Insurance
  • Video
  • Guide
No Result
View All Result
EVAutoBlog.com
No Result
View All Result
Home Auto News

Federal study lays out US charging needs by 2030

29 June 2023
in Auto News
Reading Time: 3 mins read
DOE research looks at EV charging infrastructure vulnerability

#image_title

Stricter emissions standards, automaker EV goals, and increasing consumer demand for EVs will create more need for public charging infrastructure, which a new study from the National Renewable Energy Laboratory (NREL) aims to quantify.

The NREL estimates that current regulatory and industry trends will lead to 30 million to 42 million EVs on U.S. roads by 2030. Researchers estimated the number, type, and location of public chargers to meet that demand, working with the Joint Office of Energy and Transportation and U.S. Department of Energy’s Vehicle Technologies Office.

U.S. charging needs for 2030 (from NREL study)

U.S. charging needs for 2030 (from NREL study)

 

“The 2030 National Charging Network study ties together two of the administration’s priorities: building a national EV charging network and working toward the 2030 goal for the majority of all new car sales to be battery-electric vehicles,” said Gabe Klein, executive director of the Joint Office of Energy and Transportation. “It’s a framework for what is needed nationally, in terms of the types of charging required, their number, and where those chargers should go.”

Researchers estimate that a national charging network will require 182,000 publicly-accessible DC fast-charging ports by 2030, but one million Level 2 AC ports at publicly-accessible locations “including high-density neighborhoods, office buildings, and retail outlets.”

On top of that, researchers estimate the need for eight million Level 1 and Level 2 at privately-accessible locations, including both single-family and multi-family residences, and workplaces.

Lucid Connected Home Charging Station

Lucid Connected Home Charging Station

Other studies, including one from S&P Global Mobility earlier this year, have called for more Level 2 chargers than fast chargers, but NREL researchers drive home that point. While fast chargers are needed for long trips and ride-sharing, private residential charging “will form the core of the national ecosystem” because EV drivers tend to prefer the convenience of at-home charging, according to researchers.

One potential model for a major Level 2 buildout does exist. Seoul, South Korea, last year unveiled plans for 200,000 public Level 2 chargers over the next four years.

An emphasis on Level 2 charging could have other related benefits. As an MIT study earlier this year found, more workplace charging—another common application for Level 2 infrastructure—could help ease the load on the grid.

Stricter emissions standards, automaker EV goals, and increasing consumer demand for EVs will create more need for public charging infrastructure, which a new study from the National Renewable Energy Laboratory (NREL) aims to quantify.

The NREL estimates that current regulatory and industry trends will lead to 30 million to 42 million EVs on U.S. roads by 2030. Researchers estimated the number, type, and location of public chargers to meet that demand, working with the Joint Office of Energy and Transportation and U.S. Department of Energy’s Vehicle Technologies Office.

U.S. charging needs for 2030 (from NREL study)

U.S. charging needs for 2030 (from NREL study)

 

“The 2030 National Charging Network study ties together two of the administration’s priorities: building a national EV charging network and working toward the 2030 goal for the majority of all new car sales to be battery-electric vehicles,” said Gabe Klein, executive director of the Joint Office of Energy and Transportation. “It’s a framework for what is needed nationally, in terms of the types of charging required, their number, and where those chargers should go.”

Researchers estimate that a national charging network will require 182,000 publicly-accessible DC fast-charging ports by 2030, but one million Level 2 AC ports at publicly-accessible locations “including high-density neighborhoods, office buildings, and retail outlets.”

On top of that, researchers estimate the need for eight million Level 1 and Level 2 at privately-accessible locations, including both single-family and multi-family residences, and workplaces.

Lucid Connected Home Charging Station

Lucid Connected Home Charging Station

Other studies, including one from S&P Global Mobility earlier this year, have called for more Level 2 chargers than fast chargers, but NREL researchers drive home that point. While fast chargers are needed for long trips and ride-sharing, private residential charging “will form the core of the national ecosystem” because EV drivers tend to prefer the convenience of at-home charging, according to researchers.

One potential model for a major Level 2 buildout does exist. Seoul, South Korea, last year unveiled plans for 200,000 public Level 2 chargers over the next four years.

An emphasis on Level 2 charging could have other related benefits. As an MIT study earlier this year found, more workplace charging—another common application for Level 2 infrastructure—could help ease the load on the grid.

Stricter emissions standards, automaker EV goals, and increasing consumer demand for EVs will create more need for public charging infrastructure, which a new study from the National Renewable Energy Laboratory (NREL) aims to quantify.

The NREL estimates that current regulatory and industry trends will lead to 30 million to 42 million EVs on U.S. roads by 2030. Researchers estimated the number, type, and location of public chargers to meet that demand, working with the Joint Office of Energy and Transportation and U.S. Department of Energy’s Vehicle Technologies Office.

U.S. charging needs for 2030 (from NREL study)

U.S. charging needs for 2030 (from NREL study)

 

“The 2030 National Charging Network study ties together two of the administration’s priorities: building a national EV charging network and working toward the 2030 goal for the majority of all new car sales to be battery-electric vehicles,” said Gabe Klein, executive director of the Joint Office of Energy and Transportation. “It’s a framework for what is needed nationally, in terms of the types of charging required, their number, and where those chargers should go.”

Researchers estimate that a national charging network will require 182,000 publicly-accessible DC fast-charging ports by 2030, but one million Level 2 AC ports at publicly-accessible locations “including high-density neighborhoods, office buildings, and retail outlets.”

On top of that, researchers estimate the need for eight million Level 1 and Level 2 at privately-accessible locations, including both single-family and multi-family residences, and workplaces.

Lucid Connected Home Charging Station

Lucid Connected Home Charging Station

Other studies, including one from S&P Global Mobility earlier this year, have called for more Level 2 chargers than fast chargers, but NREL researchers drive home that point. While fast chargers are needed for long trips and ride-sharing, private residential charging “will form the core of the national ecosystem” because EV drivers tend to prefer the convenience of at-home charging, according to researchers.

One potential model for a major Level 2 buildout does exist. Seoul, South Korea, last year unveiled plans for 200,000 public Level 2 chargers over the next four years.

An emphasis on Level 2 charging could have other related benefits. As an MIT study earlier this year found, more workplace charging—another common application for Level 2 infrastructure—could help ease the load on the grid.

Stricter emissions standards, automaker EV goals, and increasing consumer demand for EVs will create more need for public charging infrastructure, which a new study from the National Renewable Energy Laboratory (NREL) aims to quantify.

The NREL estimates that current regulatory and industry trends will lead to 30 million to 42 million EVs on U.S. roads by 2030. Researchers estimated the number, type, and location of public chargers to meet that demand, working with the Joint Office of Energy and Transportation and U.S. Department of Energy’s Vehicle Technologies Office.

U.S. charging needs for 2030 (from NREL study)

U.S. charging needs for 2030 (from NREL study)

 

“The 2030 National Charging Network study ties together two of the administration’s priorities: building a national EV charging network and working toward the 2030 goal for the majority of all new car sales to be battery-electric vehicles,” said Gabe Klein, executive director of the Joint Office of Energy and Transportation. “It’s a framework for what is needed nationally, in terms of the types of charging required, their number, and where those chargers should go.”

Researchers estimate that a national charging network will require 182,000 publicly-accessible DC fast-charging ports by 2030, but one million Level 2 AC ports at publicly-accessible locations “including high-density neighborhoods, office buildings, and retail outlets.”

On top of that, researchers estimate the need for eight million Level 1 and Level 2 at privately-accessible locations, including both single-family and multi-family residences, and workplaces.

Lucid Connected Home Charging Station

Lucid Connected Home Charging Station

Other studies, including one from S&P Global Mobility earlier this year, have called for more Level 2 chargers than fast chargers, but NREL researchers drive home that point. While fast chargers are needed for long trips and ride-sharing, private residential charging “will form the core of the national ecosystem” because EV drivers tend to prefer the convenience of at-home charging, according to researchers.

One potential model for a major Level 2 buildout does exist. Seoul, South Korea, last year unveiled plans for 200,000 public Level 2 chargers over the next four years.

An emphasis on Level 2 charging could have other related benefits. As an MIT study earlier this year found, more workplace charging—another common application for Level 2 infrastructure—could help ease the load on the grid.

Stricter emissions standards, automaker EV goals, and increasing consumer demand for EVs will create more need for public charging infrastructure, which a new study from the National Renewable Energy Laboratory (NREL) aims to quantify.

The NREL estimates that current regulatory and industry trends will lead to 30 million to 42 million EVs on U.S. roads by 2030. Researchers estimated the number, type, and location of public chargers to meet that demand, working with the Joint Office of Energy and Transportation and U.S. Department of Energy’s Vehicle Technologies Office.

U.S. charging needs for 2030 (from NREL study)

U.S. charging needs for 2030 (from NREL study)

 

“The 2030 National Charging Network study ties together two of the administration’s priorities: building a national EV charging network and working toward the 2030 goal for the majority of all new car sales to be battery-electric vehicles,” said Gabe Klein, executive director of the Joint Office of Energy and Transportation. “It’s a framework for what is needed nationally, in terms of the types of charging required, their number, and where those chargers should go.”

Researchers estimate that a national charging network will require 182,000 publicly-accessible DC fast-charging ports by 2030, but one million Level 2 AC ports at publicly-accessible locations “including high-density neighborhoods, office buildings, and retail outlets.”

On top of that, researchers estimate the need for eight million Level 1 and Level 2 at privately-accessible locations, including both single-family and multi-family residences, and workplaces.

Lucid Connected Home Charging Station

Lucid Connected Home Charging Station

Other studies, including one from S&P Global Mobility earlier this year, have called for more Level 2 chargers than fast chargers, but NREL researchers drive home that point. While fast chargers are needed for long trips and ride-sharing, private residential charging “will form the core of the national ecosystem” because EV drivers tend to prefer the convenience of at-home charging, according to researchers.

One potential model for a major Level 2 buildout does exist. Seoul, South Korea, last year unveiled plans for 200,000 public Level 2 chargers over the next four years.

An emphasis on Level 2 charging could have other related benefits. As an MIT study earlier this year found, more workplace charging—another common application for Level 2 infrastructure—could help ease the load on the grid.

Stricter emissions standards, automaker EV goals, and increasing consumer demand for EVs will create more need for public charging infrastructure, which a new study from the National Renewable Energy Laboratory (NREL) aims to quantify.

The NREL estimates that current regulatory and industry trends will lead to 30 million to 42 million EVs on U.S. roads by 2030. Researchers estimated the number, type, and location of public chargers to meet that demand, working with the Joint Office of Energy and Transportation and U.S. Department of Energy’s Vehicle Technologies Office.

U.S. charging needs for 2030 (from NREL study)

U.S. charging needs for 2030 (from NREL study)

 

“The 2030 National Charging Network study ties together two of the administration’s priorities: building a national EV charging network and working toward the 2030 goal for the majority of all new car sales to be battery-electric vehicles,” said Gabe Klein, executive director of the Joint Office of Energy and Transportation. “It’s a framework for what is needed nationally, in terms of the types of charging required, their number, and where those chargers should go.”

Researchers estimate that a national charging network will require 182,000 publicly-accessible DC fast-charging ports by 2030, but one million Level 2 AC ports at publicly-accessible locations “including high-density neighborhoods, office buildings, and retail outlets.”

On top of that, researchers estimate the need for eight million Level 1 and Level 2 at privately-accessible locations, including both single-family and multi-family residences, and workplaces.

Lucid Connected Home Charging Station

Lucid Connected Home Charging Station

Other studies, including one from S&P Global Mobility earlier this year, have called for more Level 2 chargers than fast chargers, but NREL researchers drive home that point. While fast chargers are needed for long trips and ride-sharing, private residential charging “will form the core of the national ecosystem” because EV drivers tend to prefer the convenience of at-home charging, according to researchers.

One potential model for a major Level 2 buildout does exist. Seoul, South Korea, last year unveiled plans for 200,000 public Level 2 chargers over the next four years.

An emphasis on Level 2 charging could have other related benefits. As an MIT study earlier this year found, more workplace charging—another common application for Level 2 infrastructure—could help ease the load on the grid.

Stricter emissions standards, automaker EV goals, and increasing consumer demand for EVs will create more need for public charging infrastructure, which a new study from the National Renewable Energy Laboratory (NREL) aims to quantify.

The NREL estimates that current regulatory and industry trends will lead to 30 million to 42 million EVs on U.S. roads by 2030. Researchers estimated the number, type, and location of public chargers to meet that demand, working with the Joint Office of Energy and Transportation and U.S. Department of Energy’s Vehicle Technologies Office.

U.S. charging needs for 2030 (from NREL study)

U.S. charging needs for 2030 (from NREL study)

 

“The 2030 National Charging Network study ties together two of the administration’s priorities: building a national EV charging network and working toward the 2030 goal for the majority of all new car sales to be battery-electric vehicles,” said Gabe Klein, executive director of the Joint Office of Energy and Transportation. “It’s a framework for what is needed nationally, in terms of the types of charging required, their number, and where those chargers should go.”

Researchers estimate that a national charging network will require 182,000 publicly-accessible DC fast-charging ports by 2030, but one million Level 2 AC ports at publicly-accessible locations “including high-density neighborhoods, office buildings, and retail outlets.”

On top of that, researchers estimate the need for eight million Level 1 and Level 2 at privately-accessible locations, including both single-family and multi-family residences, and workplaces.

Lucid Connected Home Charging Station

Lucid Connected Home Charging Station

Other studies, including one from S&P Global Mobility earlier this year, have called for more Level 2 chargers than fast chargers, but NREL researchers drive home that point. While fast chargers are needed for long trips and ride-sharing, private residential charging “will form the core of the national ecosystem” because EV drivers tend to prefer the convenience of at-home charging, according to researchers.

One potential model for a major Level 2 buildout does exist. Seoul, South Korea, last year unveiled plans for 200,000 public Level 2 chargers over the next four years.

An emphasis on Level 2 charging could have other related benefits. As an MIT study earlier this year found, more workplace charging—another common application for Level 2 infrastructure—could help ease the load on the grid.

Stricter emissions standards, automaker EV goals, and increasing consumer demand for EVs will create more need for public charging infrastructure, which a new study from the National Renewable Energy Laboratory (NREL) aims to quantify.

The NREL estimates that current regulatory and industry trends will lead to 30 million to 42 million EVs on U.S. roads by 2030. Researchers estimated the number, type, and location of public chargers to meet that demand, working with the Joint Office of Energy and Transportation and U.S. Department of Energy’s Vehicle Technologies Office.

U.S. charging needs for 2030 (from NREL study)

U.S. charging needs for 2030 (from NREL study)

 

“The 2030 National Charging Network study ties together two of the administration’s priorities: building a national EV charging network and working toward the 2030 goal for the majority of all new car sales to be battery-electric vehicles,” said Gabe Klein, executive director of the Joint Office of Energy and Transportation. “It’s a framework for what is needed nationally, in terms of the types of charging required, their number, and where those chargers should go.”

Researchers estimate that a national charging network will require 182,000 publicly-accessible DC fast-charging ports by 2030, but one million Level 2 AC ports at publicly-accessible locations “including high-density neighborhoods, office buildings, and retail outlets.”

On top of that, researchers estimate the need for eight million Level 1 and Level 2 at privately-accessible locations, including both single-family and multi-family residences, and workplaces.

Lucid Connected Home Charging Station

Lucid Connected Home Charging Station

Other studies, including one from S&P Global Mobility earlier this year, have called for more Level 2 chargers than fast chargers, but NREL researchers drive home that point. While fast chargers are needed for long trips and ride-sharing, private residential charging “will form the core of the national ecosystem” because EV drivers tend to prefer the convenience of at-home charging, according to researchers.

One potential model for a major Level 2 buildout does exist. Seoul, South Korea, last year unveiled plans for 200,000 public Level 2 chargers over the next four years.

An emphasis on Level 2 charging could have other related benefits. As an MIT study earlier this year found, more workplace charging—another common application for Level 2 infrastructure—could help ease the load on the grid.

RelatedPosts

Could Jeep reinvent planetary hybrid tech for 4WD adventures?

Affordable EV will face 2026 Chevy Bolt EV

Rivian spinoff focuses on small EVs, “ways to move beyond cars”

Stricter emissions standards, automaker EV goals, and increasing consumer demand for EVs will create more need for public charging infrastructure, which a new study from the National Renewable Energy Laboratory (NREL) aims to quantify.

The NREL estimates that current regulatory and industry trends will lead to 30 million to 42 million EVs on U.S. roads by 2030. Researchers estimated the number, type, and location of public chargers to meet that demand, working with the Joint Office of Energy and Transportation and U.S. Department of Energy’s Vehicle Technologies Office.

U.S. charging needs for 2030 (from NREL study)

U.S. charging needs for 2030 (from NREL study)

 

“The 2030 National Charging Network study ties together two of the administration’s priorities: building a national EV charging network and working toward the 2030 goal for the majority of all new car sales to be battery-electric vehicles,” said Gabe Klein, executive director of the Joint Office of Energy and Transportation. “It’s a framework for what is needed nationally, in terms of the types of charging required, their number, and where those chargers should go.”

Researchers estimate that a national charging network will require 182,000 publicly-accessible DC fast-charging ports by 2030, but one million Level 2 AC ports at publicly-accessible locations “including high-density neighborhoods, office buildings, and retail outlets.”

On top of that, researchers estimate the need for eight million Level 1 and Level 2 at privately-accessible locations, including both single-family and multi-family residences, and workplaces.

Lucid Connected Home Charging Station

Lucid Connected Home Charging Station

Other studies, including one from S&P Global Mobility earlier this year, have called for more Level 2 chargers than fast chargers, but NREL researchers drive home that point. While fast chargers are needed for long trips and ride-sharing, private residential charging “will form the core of the national ecosystem” because EV drivers tend to prefer the convenience of at-home charging, according to researchers.

One potential model for a major Level 2 buildout does exist. Seoul, South Korea, last year unveiled plans for 200,000 public Level 2 chargers over the next four years.

An emphasis on Level 2 charging could have other related benefits. As an MIT study earlier this year found, more workplace charging—another common application for Level 2 infrastructure—could help ease the load on the grid.

Stricter emissions standards, automaker EV goals, and increasing consumer demand for EVs will create more need for public charging infrastructure, which a new study from the National Renewable Energy Laboratory (NREL) aims to quantify.

The NREL estimates that current regulatory and industry trends will lead to 30 million to 42 million EVs on U.S. roads by 2030. Researchers estimated the number, type, and location of public chargers to meet that demand, working with the Joint Office of Energy and Transportation and U.S. Department of Energy’s Vehicle Technologies Office.

U.S. charging needs for 2030 (from NREL study)

U.S. charging needs for 2030 (from NREL study)

 

“The 2030 National Charging Network study ties together two of the administration’s priorities: building a national EV charging network and working toward the 2030 goal for the majority of all new car sales to be battery-electric vehicles,” said Gabe Klein, executive director of the Joint Office of Energy and Transportation. “It’s a framework for what is needed nationally, in terms of the types of charging required, their number, and where those chargers should go.”

Researchers estimate that a national charging network will require 182,000 publicly-accessible DC fast-charging ports by 2030, but one million Level 2 AC ports at publicly-accessible locations “including high-density neighborhoods, office buildings, and retail outlets.”

On top of that, researchers estimate the need for eight million Level 1 and Level 2 at privately-accessible locations, including both single-family and multi-family residences, and workplaces.

Lucid Connected Home Charging Station

Lucid Connected Home Charging Station

Other studies, including one from S&P Global Mobility earlier this year, have called for more Level 2 chargers than fast chargers, but NREL researchers drive home that point. While fast chargers are needed for long trips and ride-sharing, private residential charging “will form the core of the national ecosystem” because EV drivers tend to prefer the convenience of at-home charging, according to researchers.

One potential model for a major Level 2 buildout does exist. Seoul, South Korea, last year unveiled plans for 200,000 public Level 2 chargers over the next four years.

An emphasis on Level 2 charging could have other related benefits. As an MIT study earlier this year found, more workplace charging—another common application for Level 2 infrastructure—could help ease the load on the grid.

Stricter emissions standards, automaker EV goals, and increasing consumer demand for EVs will create more need for public charging infrastructure, which a new study from the National Renewable Energy Laboratory (NREL) aims to quantify.

The NREL estimates that current regulatory and industry trends will lead to 30 million to 42 million EVs on U.S. roads by 2030. Researchers estimated the number, type, and location of public chargers to meet that demand, working with the Joint Office of Energy and Transportation and U.S. Department of Energy’s Vehicle Technologies Office.

U.S. charging needs for 2030 (from NREL study)

U.S. charging needs for 2030 (from NREL study)

 

“The 2030 National Charging Network study ties together two of the administration’s priorities: building a national EV charging network and working toward the 2030 goal for the majority of all new car sales to be battery-electric vehicles,” said Gabe Klein, executive director of the Joint Office of Energy and Transportation. “It’s a framework for what is needed nationally, in terms of the types of charging required, their number, and where those chargers should go.”

Researchers estimate that a national charging network will require 182,000 publicly-accessible DC fast-charging ports by 2030, but one million Level 2 AC ports at publicly-accessible locations “including high-density neighborhoods, office buildings, and retail outlets.”

On top of that, researchers estimate the need for eight million Level 1 and Level 2 at privately-accessible locations, including both single-family and multi-family residences, and workplaces.

Lucid Connected Home Charging Station

Lucid Connected Home Charging Station

Other studies, including one from S&P Global Mobility earlier this year, have called for more Level 2 chargers than fast chargers, but NREL researchers drive home that point. While fast chargers are needed for long trips and ride-sharing, private residential charging “will form the core of the national ecosystem” because EV drivers tend to prefer the convenience of at-home charging, according to researchers.

One potential model for a major Level 2 buildout does exist. Seoul, South Korea, last year unveiled plans for 200,000 public Level 2 chargers over the next four years.

An emphasis on Level 2 charging could have other related benefits. As an MIT study earlier this year found, more workplace charging—another common application for Level 2 infrastructure—could help ease the load on the grid.

Stricter emissions standards, automaker EV goals, and increasing consumer demand for EVs will create more need for public charging infrastructure, which a new study from the National Renewable Energy Laboratory (NREL) aims to quantify.

The NREL estimates that current regulatory and industry trends will lead to 30 million to 42 million EVs on U.S. roads by 2030. Researchers estimated the number, type, and location of public chargers to meet that demand, working with the Joint Office of Energy and Transportation and U.S. Department of Energy’s Vehicle Technologies Office.

U.S. charging needs for 2030 (from NREL study)

U.S. charging needs for 2030 (from NREL study)

 

“The 2030 National Charging Network study ties together two of the administration’s priorities: building a national EV charging network and working toward the 2030 goal for the majority of all new car sales to be battery-electric vehicles,” said Gabe Klein, executive director of the Joint Office of Energy and Transportation. “It’s a framework for what is needed nationally, in terms of the types of charging required, their number, and where those chargers should go.”

Researchers estimate that a national charging network will require 182,000 publicly-accessible DC fast-charging ports by 2030, but one million Level 2 AC ports at publicly-accessible locations “including high-density neighborhoods, office buildings, and retail outlets.”

On top of that, researchers estimate the need for eight million Level 1 and Level 2 at privately-accessible locations, including both single-family and multi-family residences, and workplaces.

Lucid Connected Home Charging Station

Lucid Connected Home Charging Station

Other studies, including one from S&P Global Mobility earlier this year, have called for more Level 2 chargers than fast chargers, but NREL researchers drive home that point. While fast chargers are needed for long trips and ride-sharing, private residential charging “will form the core of the national ecosystem” because EV drivers tend to prefer the convenience of at-home charging, according to researchers.

One potential model for a major Level 2 buildout does exist. Seoul, South Korea, last year unveiled plans for 200,000 public Level 2 chargers over the next four years.

An emphasis on Level 2 charging could have other related benefits. As an MIT study earlier this year found, more workplace charging—another common application for Level 2 infrastructure—could help ease the load on the grid.

Stricter emissions standards, automaker EV goals, and increasing consumer demand for EVs will create more need for public charging infrastructure, which a new study from the National Renewable Energy Laboratory (NREL) aims to quantify.

The NREL estimates that current regulatory and industry trends will lead to 30 million to 42 million EVs on U.S. roads by 2030. Researchers estimated the number, type, and location of public chargers to meet that demand, working with the Joint Office of Energy and Transportation and U.S. Department of Energy’s Vehicle Technologies Office.

U.S. charging needs for 2030 (from NREL study)

U.S. charging needs for 2030 (from NREL study)

 

“The 2030 National Charging Network study ties together two of the administration’s priorities: building a national EV charging network and working toward the 2030 goal for the majority of all new car sales to be battery-electric vehicles,” said Gabe Klein, executive director of the Joint Office of Energy and Transportation. “It’s a framework for what is needed nationally, in terms of the types of charging required, their number, and where those chargers should go.”

Researchers estimate that a national charging network will require 182,000 publicly-accessible DC fast-charging ports by 2030, but one million Level 2 AC ports at publicly-accessible locations “including high-density neighborhoods, office buildings, and retail outlets.”

On top of that, researchers estimate the need for eight million Level 1 and Level 2 at privately-accessible locations, including both single-family and multi-family residences, and workplaces.

Lucid Connected Home Charging Station

Lucid Connected Home Charging Station

Other studies, including one from S&P Global Mobility earlier this year, have called for more Level 2 chargers than fast chargers, but NREL researchers drive home that point. While fast chargers are needed for long trips and ride-sharing, private residential charging “will form the core of the national ecosystem” because EV drivers tend to prefer the convenience of at-home charging, according to researchers.

One potential model for a major Level 2 buildout does exist. Seoul, South Korea, last year unveiled plans for 200,000 public Level 2 chargers over the next four years.

An emphasis on Level 2 charging could have other related benefits. As an MIT study earlier this year found, more workplace charging—another common application for Level 2 infrastructure—could help ease the load on the grid.

Stricter emissions standards, automaker EV goals, and increasing consumer demand for EVs will create more need for public charging infrastructure, which a new study from the National Renewable Energy Laboratory (NREL) aims to quantify.

The NREL estimates that current regulatory and industry trends will lead to 30 million to 42 million EVs on U.S. roads by 2030. Researchers estimated the number, type, and location of public chargers to meet that demand, working with the Joint Office of Energy and Transportation and U.S. Department of Energy’s Vehicle Technologies Office.

U.S. charging needs for 2030 (from NREL study)

U.S. charging needs for 2030 (from NREL study)

 

“The 2030 National Charging Network study ties together two of the administration’s priorities: building a national EV charging network and working toward the 2030 goal for the majority of all new car sales to be battery-electric vehicles,” said Gabe Klein, executive director of the Joint Office of Energy and Transportation. “It’s a framework for what is needed nationally, in terms of the types of charging required, their number, and where those chargers should go.”

Researchers estimate that a national charging network will require 182,000 publicly-accessible DC fast-charging ports by 2030, but one million Level 2 AC ports at publicly-accessible locations “including high-density neighborhoods, office buildings, and retail outlets.”

On top of that, researchers estimate the need for eight million Level 1 and Level 2 at privately-accessible locations, including both single-family and multi-family residences, and workplaces.

Lucid Connected Home Charging Station

Lucid Connected Home Charging Station

Other studies, including one from S&P Global Mobility earlier this year, have called for more Level 2 chargers than fast chargers, but NREL researchers drive home that point. While fast chargers are needed for long trips and ride-sharing, private residential charging “will form the core of the national ecosystem” because EV drivers tend to prefer the convenience of at-home charging, according to researchers.

One potential model for a major Level 2 buildout does exist. Seoul, South Korea, last year unveiled plans for 200,000 public Level 2 chargers over the next four years.

An emphasis on Level 2 charging could have other related benefits. As an MIT study earlier this year found, more workplace charging—another common application for Level 2 infrastructure—could help ease the load on the grid.

Stricter emissions standards, automaker EV goals, and increasing consumer demand for EVs will create more need for public charging infrastructure, which a new study from the National Renewable Energy Laboratory (NREL) aims to quantify.

The NREL estimates that current regulatory and industry trends will lead to 30 million to 42 million EVs on U.S. roads by 2030. Researchers estimated the number, type, and location of public chargers to meet that demand, working with the Joint Office of Energy and Transportation and U.S. Department of Energy’s Vehicle Technologies Office.

U.S. charging needs for 2030 (from NREL study)

U.S. charging needs for 2030 (from NREL study)

 

“The 2030 National Charging Network study ties together two of the administration’s priorities: building a national EV charging network and working toward the 2030 goal for the majority of all new car sales to be battery-electric vehicles,” said Gabe Klein, executive director of the Joint Office of Energy and Transportation. “It’s a framework for what is needed nationally, in terms of the types of charging required, their number, and where those chargers should go.”

Researchers estimate that a national charging network will require 182,000 publicly-accessible DC fast-charging ports by 2030, but one million Level 2 AC ports at publicly-accessible locations “including high-density neighborhoods, office buildings, and retail outlets.”

On top of that, researchers estimate the need for eight million Level 1 and Level 2 at privately-accessible locations, including both single-family and multi-family residences, and workplaces.

Lucid Connected Home Charging Station

Lucid Connected Home Charging Station

Other studies, including one from S&P Global Mobility earlier this year, have called for more Level 2 chargers than fast chargers, but NREL researchers drive home that point. While fast chargers are needed for long trips and ride-sharing, private residential charging “will form the core of the national ecosystem” because EV drivers tend to prefer the convenience of at-home charging, according to researchers.

One potential model for a major Level 2 buildout does exist. Seoul, South Korea, last year unveiled plans for 200,000 public Level 2 chargers over the next four years.

An emphasis on Level 2 charging could have other related benefits. As an MIT study earlier this year found, more workplace charging—another common application for Level 2 infrastructure—could help ease the load on the grid.

Stricter emissions standards, automaker EV goals, and increasing consumer demand for EVs will create more need for public charging infrastructure, which a new study from the National Renewable Energy Laboratory (NREL) aims to quantify.

The NREL estimates that current regulatory and industry trends will lead to 30 million to 42 million EVs on U.S. roads by 2030. Researchers estimated the number, type, and location of public chargers to meet that demand, working with the Joint Office of Energy and Transportation and U.S. Department of Energy’s Vehicle Technologies Office.

U.S. charging needs for 2030 (from NREL study)

U.S. charging needs for 2030 (from NREL study)

 

“The 2030 National Charging Network study ties together two of the administration’s priorities: building a national EV charging network and working toward the 2030 goal for the majority of all new car sales to be battery-electric vehicles,” said Gabe Klein, executive director of the Joint Office of Energy and Transportation. “It’s a framework for what is needed nationally, in terms of the types of charging required, their number, and where those chargers should go.”

Researchers estimate that a national charging network will require 182,000 publicly-accessible DC fast-charging ports by 2030, but one million Level 2 AC ports at publicly-accessible locations “including high-density neighborhoods, office buildings, and retail outlets.”

On top of that, researchers estimate the need for eight million Level 1 and Level 2 at privately-accessible locations, including both single-family and multi-family residences, and workplaces.

Lucid Connected Home Charging Station

Lucid Connected Home Charging Station

Other studies, including one from S&P Global Mobility earlier this year, have called for more Level 2 chargers than fast chargers, but NREL researchers drive home that point. While fast chargers are needed for long trips and ride-sharing, private residential charging “will form the core of the national ecosystem” because EV drivers tend to prefer the convenience of at-home charging, according to researchers.

One potential model for a major Level 2 buildout does exist. Seoul, South Korea, last year unveiled plans for 200,000 public Level 2 chargers over the next four years.

An emphasis on Level 2 charging could have other related benefits. As an MIT study earlier this year found, more workplace charging—another common application for Level 2 infrastructure—could help ease the load on the grid.

Tags: chargingElectricElectric carElectric VehicleEVinfrastructure
Previous Post

GM details hardware for using EVs as home power backup

Next Post

Polestar EVs get Tesla charge port in 2025, Supercharger access in 2024

Related Posts

Could Jeep reinvent planetary hybrid tech for 4WD adventures?
Auto News

Could Jeep reinvent planetary hybrid tech for 4WD adventures?

28 March 2025

Stellantis may be looking to adapt planetary gear hybrid systems—like the one currently used in the Chrysler Pacifica Hybrid plug-in hybrid...

Read more
Affordable EV will face 2026 Chevy Bolt EV
Auto News

Affordable EV will face 2026 Chevy Bolt EV

27 March 2025

Next-generation Nissan Leaf will launch first in U.S. and Canada, be fully revealed this year Rogue Hybrid and Rogue PHEV...

Read more
No Result
View All Result

Recent Posts

  • Tesla welcomes Chipotle President Jack Hartung to its Board of Directors
  • The Tesla Cybertruck Is No Longer The Best-Selling EV Truck In America
  • The Boring Company paves the way for Tesla robotaxi future
  • Tesla Board Scrambles To Redo Musk’s Multi-Billion Dollar Payday
  • Tesla battery supplier feels pressure to expedite US production

Archives

  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • Home
  • Privacy Policy
  • Terms & conditions
  • Affiliate Disclosure
  • Contact us

© 2021 evautoblog.com

No Result
View All Result
  • Home
  • General News
  • Auto News
  • Vehicle Insurance
  • Video
  • Guide

© 2021 evautoblog.com

This website uses information gathering tools including cookies, and other similar technology. We use cookies to personalize content and ads, to provide social media features and to analyze our traffic. We also share information about your use of our site with our social media, advertising and analytics partners. By clicking “Accept”, you consent to the use of ALL the cookies.
Do not sell my personal information. Ad and Cookie Policy
Cookie SettingsAccept



Manage consent

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. These cookies ensure basic functionalities and security features of the website, anonymously.
CookieDurationDescription
cookielawinfo-checkbox-analytics11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics".
cookielawinfo-checkbox-functional11 monthsThe cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional".
cookielawinfo-checkbox-necessary11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary".
cookielawinfo-checkbox-others11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other.
cookielawinfo-checkbox-performance11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance".
viewed_cookie_policy11 monthsThe cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data.
Functional
Functional cookies help to perform certain functionalities like sharing the content of the website on social media platforms, collect feedbacks, and other third-party features.
Performance
Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.
Analytics
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics the number of visitors, bounce rate, traffic source, etc.
Advertisement
Advertisement cookies are used to provide visitors with relevant ads and marketing campaigns. These cookies track visitors across websites and collect information to provide customized ads.
Others
Other uncategorized cookies are those that are being analyzed and have not been classified into a category as yet.
SAVE & ACCEPT